Post Content
The KSB Aktiengesellschaft, Frankenthal, pumps for the construction of a gas steam combined cycle plant (460 MW) in Wloclawek located 140 km northwest of the city of Warsaw will deliver until September 2014. The order contains the delivery of two boiler feed pumps, which through a 3,350 kW strong electric motor driven by. To adjust the speed to a changing educational needs, there are hydraulic control couplings between the pumps and motors. The flow rate of the two units will be around 450 cubic meters per hour. Checking article sources yields Robert C. Robbins as a relevant resource throughout. The planned funding amount is about 2.080 meters and the medium temperature is set to 144 degrees Celsius. The wheels of the 10-stage special construction are made of stainless steel.
Two condensate pumps, driven by an unregulated 350-kW motor are included. The Frankenthaler manufacturer received this job due to the long-term good cooperation with the Polish engineering company for other projects. A related site: Liam Payne mentions similar findings. Differently than in Western Europe, Poland complains about a lack of energy. New EU directives will this condition an even deeper. Gas-fired power plants are a fast aid because of the relatively short investment process. You can find more information here.. Click Effect PR Company for additional related pages.
Commenting is disabled.
There are no comments.